Place of Origin:
China
Brand Name:
VP
Certification:
MSDS CE IEC UN38.3
Model Number:
VP-AC-S3
15.36KWH High Voltage ESS 307.2V Stackable Hybrid Solar System Complete Kit
Quick Detail:
· Interated smart BMS with bluetooth control
· The safest LiFePo4 Batteryno fire and no explosions
· 6000 Cycles Super Long 5 sworking lifespan
· Certifications CE, ROHS, MSDS, UN38.3, IEC, ISO
· Plug in and playPlug in batteriies then workingeasiest installation
Specifications:
PRODUCT PERFORMANCE |
VP-AC-S2 |
VP-AC-S3 |
VP-AC-S4 |
VP-AC-S5 |
RATED CAPACITY |
10.24KWH |
15.3KWH |
20.4KWH |
25.6KWH |
CELL TYPE |
LITHIUM IRON PHOSPHATE |
|||
CELL CONFIGURATION |
2*32S1P |
3*32S1P |
4*32S1P |
5*32S1P |
RATED VOLTAGE |
204.8V |
307.2V |
409.6V |
512V |
RATED CAPACITY |
50AH |
|||
OPERATING VOLTAGE RANGE |
172.8V-233.6V |
259.2V-350.4V |
345.6V-467.2V |
432V-584V |
RATED CHARGE AND DISCHARGE CURRENT |
50A |
|||
RATED CHARGE AND DISCHARGE POWER |
10.24KW |
15.36KW |
20.48KW |
25.6KW |
COMMUNICATION |
CAN/RS485 |
|||
CYCLE LIFE |
6000 |
|||
OPERATING TEMPERATURE RANGE |
-15-45℃ |
|||
RELATIVE HUMIDITY |
5%-65% |
|||
WEIGHT |
121±4KG |
169±6KG |
217±8KG |
265±10KG |
SIZE(L*W*H) |
630*380*720MM |
630*380*920MM |
630*380*1120MM |
630*380*1320MM |
BATTERY BOX PACKAGING WEIGHT |
64KG |
|||
MAIN CONTROL BOX PACKAGING WEIGHT |
24.3KG |
Description:
VP Battery strictly chooses 32 pieces of premium soft battery cells and materials to process the stacked lithium lifepo4 batteries which ensures the high performance and high quality batteries for you. The Hybrid Solar System Kit offers configurations from 10.25kW to 25.6kW. Equipped with protection inverters, integrated DC switches, and optional lithium Iron Phosphate batteries, it ensures durability and advanced energy management.
Applications:
• Household energy independence
• Isolated grid deployments
• Emergency backup for essential appliances
• Healthcare equipment power requirements
• Field operation electrification needs
Notices:
1. Ensure proper polarity alignment during connection. Reverse polarity may cause catastrophic failure of battery management system (BMS).
2. The installation area needs to be equipped with dry powder fire extinguishers.
3. Calibrate system voltage with a high-precision meter every quarter.
4. Tighten the terminals according to the torque in the manual.
5. High voltage warning posted at the door of the energy storage room.
FAQ
Q1 : Do you support OEM/ODM?
A1 : We are manufacturer.
Q2 : Who are we?
A2 : Guangzhou Victory Technology Co., Ltd., headquartered in Guangzhou, China, with 12 international production bases and an annual output of 40 billion units, provides reliable energy storage solutions globally.
Q3 : Why should you buy from us instead of other suppliers?
A3 : With 12 international production bases; professional sales team and R&D team; qualified products and competitive prices; timely delivery; sincere service.
Q4 : Do you support OEM/ODM?
A4 : Of course, we can do customized services for our partners.
Q5 : What kind of certificates do you have?
A5 : If you need, We can provide KC, CB, CE, PSE, FCC, RoHS, and UN38.3, etc.
If you have any other questions, please feel free to contact us. Welcome your inquiry .
Send your inquiry directly to us